Publication CODE |
Title |
NBN EN IEC 60071-2:2018 (2018-05) |
INSULATION CO-ORDINATION - PART 2: APPLICATION GUIDELINES |
|
Price Excl. VAT |
Total number of pages, tables and drawings |
25.00 €
|
3. |
Description
NEW!IEC 60071-2:2018 is available as IEC 60071-2:2018 RLV which contains the International Standard and its Redline version, showing all changes of the technical content compared to the previous edition.IEC 60071-2:2018 constitutes application guidelines and deals with the selection of insulation levels of equipment or installations for three-phase electrical systems. It gives guidance for the determination of the rated withstand voltages for ranges I and II of IEC 60071-1 and to justify the association of these rated values with the standardized highest voltages for equipment. It covers three-phase systems with nominal voltages above 1 kV. It has the status of a horizontal standard in accordance with IEC Guide 108. This edition includes the following significant technical changes with respect to the previous edition:
a) the annex on clearance in air to assure a specified impulse withstand voltage installation is deleted because the annex in IEC 60071-1 is overlapped;
b) 4.2 and 4.3 on surge arresters are updated;
c) 4.3.5 on very-fast-front overvoltages is revised. Annex J on insulation co-ordination for very-fast-front overvoltages in UHV substations is added;
d) Annex H on atmospheric correction - altitude correction is added.
e) Annex I on evaluation method of non-standard lightning overvoltage shape is added.
|
Class |
C
|
Available files
ATTENTION: Belgian registered standards (NBN EN or NBN HD) are generally
only available in English or French. Only the cover page is translated
and the document itself is in English or in French.
Very important notice: 98% of the text of the NBN EN 55XXX,
NBN EN 6XXXX comes from the IEC text which is NOT included.
This text can be ordered here:
IEC 60071-2:2018.
For the series NBN EN 50XXX, the standards are however complete.
|
DE version
|
EN version
|
FR version
|
|
Committee |
TC 28
INSULATION CO-ORDINATION (Horizontal Committee)
|
BEC Approval |
2018-04-20 |
NBN Approval |
2018-05-29 |
Belgian Official Journal |
2018-06-28 |
Registration |
185702 |
ICS-Code (International Standards Classification) |
29.080
|
NBN Status |
New |
|
Date of ratification (d.o.r.) |
2018-04-20 |
Date of availability (d.a.v.) |
2018-05-04 |
Date of announcement (d.o.a.) |
2018-07-20 |
Date of publication (d.o.p.) |
2019-01-20 |
Date of withdrawal former edition (d.o.w.) |
2021-04-20 |
|