Account:  - Login  |  Webstore  |  Shopping basket cart
English  |  Français  |  Nederlands

Publication details

Publication CODE Title
IEC TS 63189-1:2023 (2023-09) VIRTUAL POWER PLANTS - PART 1: ARCHITECTURE AND FUNCTIONAL REQUIREMENTS
 
Price Excl. VAT Total number of pages, tables and drawings
159.00 € 24.
Description
IEC TS 63189-1:2023 covers the terms and definitions, system composition and control modes of virtual power plant (VPP). It defines the functional requirements for VPPs, including power generation forecasting, load forecasting, generation and consumption scheduling, control and management of energy storage devices and loads, coordinated optimization of distributed energy resources, status monitoring and communication, data collection and analysis, and market transactions.
Since a virtual power plant is a cluster of dispersed energy converting installations, which are aggregated, it uses additional systems to achieve its objectives (e.g. regional energy meteorology forecasting, site specific energy management systems, SCADA and other communication systems).
Local regulations, the electricity market model and the corresponding manner of organising the market related to the utilisation of controllable DER affect the management, control and operation of VPPs.
Class  C990  (IEC PUBLICATIONS IEC PUBLICATIONS)
Available files
EN version

Status
Status IEC PUBLICATION
Situation Currently active
Origin
Committee TC 8/SC 8B
Decentralized Electrical Energy Systems
Approval
BEC Approval 2023-09-26
ICS-Code (International Standards Classification) 29.240.01
NBN Status New
IEC publication date 2023-09-26
IEC stability date 2025-12-31
IEC file modification date 2023-09-26
IEC last modification date 2023-09-26