IEC 62382:2006 (2006-11) |
ELECTRICAL AND INSTRUMENTATION LOOP CHECK |
|
Price Excl. VAT |
Total number of pages, tables and drawings |
122.00 €
|
18 P.. |
Description
Describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. Is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter).
|
Class |
C990
(IEC PUBLICATIONS IEC PUBLICATIONS)
|
Committee |
TC 65/SC 65E
SYSTEM: ENGINEERING AND MANAGEMENT
|
Responsible |
Ir DELENS Marc
|
BEC Approval |
2006-11-15 |
ICS-Code (International Standards Classification) |
25.040.01
|
|
IEC publication date |
2006-11-15 |
IEC last modification date |
2015-03-04 |
|