Publication CODE |
Title |
IEC TR 61850-90-2:2016 (2016-02) |
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 90-2: USING IEC 61850 FOR COMMUNICATION BETWEEN SUBSTATIONS AND CONTROL CENTRES |
|
Price Excl. VAT |
Total number of pages, tables and drawings |
451.00 €
|
188 P.. |
Description
IEC TR 61850-90-2:2016(E) provides a comprehensive overview of the different aspects that need to be considered while using IEC 61850 for information exchange between substations and control or maintenance centres or other system level applications. In particular, this technical report:
- defines use cases and communication requirements that require an information exchange between substations and control or maintenance centres;
- describes the usage of the configuration language of IEC 61850-6;
- gives guidelines for the selection of communication services and architectures compatible with IEC 61850;
- describes the engineering workflow; introduces the use of a Proxy/Gateway concept;
- describes the links regarding the Specific Communication Service Mapping.
|
Class |
C990
(IEC PUBLICATIONS IEC PUBLICATIONS)
|
Status |
IEC PUBLICATION |
Situation |
Currently active
|
|
Committee |
TC 57
POWER SYSTEM CONTROL AND ASSOCIATED COMMUNICATIONS
|
Responsible |
Monsieur DE LEEUW Thierry, Technical Officer
Diamant Building
Bd Auguste Reyers, 80
1030
BRUXELLES
Phone: +32 2 706 85 72
E-mail: thierry.deleeuw@ceb-bec.be
|
BEC Approval |
2016-02-25 |
ICS-Code (International Standards Classification) |
33.200
|
NBN Status |
New |
|
IEC publication date |
2016-02-25 |
IEC stability date |
2020-12-31 |
IEC file modification date |
2016-02-25 |
IEC last modification date |
2018-07-13 |
|