Publication CODE |
Title |
IEC 60071-2:2018 (2018-03) |
INSULATION CO-ORDINATION - PART 2: APPLICATION GUIDELINES |
|
Price Excl. VAT |
Total number of pages, tables and drawings |
424.00 €
|
316. |
Description
IEC 60071-2:2018 is now available as IEC 60071-2:2018 RLV which contains the International Standard and its Redline version, showing all changes of the technical content compared to the previous edition.
IEC 60071-2:2018 constitutes application guidelines and deals with the selection of insulation levels of equipment or installations for three-phase electrical systems. It gives guidance for the determination of the rated withstand voltages for ranges I and II of IEC 60071-1 and to justify the association of these rated values with the standardized highest voltages for equipment. It covers three-phase systems with nominal voltages above 1 kV. This edition includes the following significant technical changes with respect to the previous edition:
a) the annex on clearance in air to assure a specified impulse withstand voltage installation is deleted because the annex in IEC 60071-1 is overlapped;
b) 4.2 and 4.3 on surge arresters are updated;
c) 4.3.5 on very-fast-front overvoltages is revised. Annex J on insulation co-ordination for very-fast-front overvoltages in UHV substations is added;
d) Annex H on atmospheric correction - altitude correction is added.
e) Annex I on evaluation method of non-standard lightning overvoltage shape is added.
It has the status of a horizontal standard in accordance with IEC Guide 108.
|
Class |
C990
(IEC PUBLICATIONS IEC PUBLICATIONS)
|
Committee |
TC 28
INSULATION CO-ORDINATION (Horizontal Committee)
|
BEC Approval |
2018-03-16 |
ICS-Code (International Standards Classification) |
29.080.30
|
NBN Status |
New |
|
IEC publication date |
2018-03-16 |
IEC stability date |
2022-12-31 |
IEC file modification date |
2018-03-16 |
IEC last modification date |
2020-03-12 |
|