Publication CODE |
Title |
IEC TR 61850-90-4:2013 (2013-08) |
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 90-4: NETWORK ENGINEERING GUIDELINES |
|
Price Excl. VAT |
Total number of pages, tables and drawings |
451.00 €
|
264. |
Description
IEC/TR 61850-90-4:2013(E) is intended for an audience familiar with network communication and/or IEC 61850-based systems and particularly for substation protection and control equipment vendors, network equipment vendors and system integrators. This Technical Report focuses on engineering a local area network limited to the requirements of IEC 61850-based substation automation. It outlines the advantages and disadvantages of different approaches to network topology, redundancy, clock synchronization, etc. so that the network designer can make educated decisions. In addition, this report outlines possible improvements to both substation automation and networking equipment. This Technical Report addresses the most critical aspects of IEC 61850, such as protection related to tripping over the network. This Technical Report addresses in particular the multicast data transfer of large volumes of sampled values from merging units. It also considers the high precision clock synchronization and "seamless" guaranteed transport of data across the network under failure conditions that is central to the process bus concept.
|
Class |
C990
(IEC PUBLICATIONS IEC PUBLICATIONS)
|
Committee |
TC 57
POWER SYSTEM CONTROL AND ASSOCIATED COMMUNICATIONS
|
Responsible |
Monsieur DE LEEUW Thierry, Technical Officer
Diamant Building
Bd Auguste Reyers, 80
1030
BRUXELLES
Phone: +32 2 706 85 72
E-mail: thierry.deleeuw@ceb-bec.be
|
BEC Approval |
2013-08-06 |
ICS-Code (International Standards Classification) |
33.200
|
NBN Status |
New |
|
IEC publication date |
2013-08-06 |
IEC stability date |
2020-12-31 |
IEC file modification date |
2013-08-06 |
IEC last modification date |
2018-07-13 |
|