IEC 61850-7-410:2012 (2012-10) |
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL |
|
Price Excl. VAT |
Total number of pages, tables and drawings |
366.00 €
|
122. |
Description
IEC 61850-7-410:2012 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows:
- the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010;
- the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated;
- most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510.
This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant.
|
Class |
C990
(IEC PUBLICATIONS IEC PUBLICATIONS)
|
Committee |
TC 57
POWER SYSTEM CONTROL AND ASSOCIATED COMMUNICATIONS
|
Responsible |
Monsieur DE LEEUW Thierry, Technical Officer
Diamant Building
Bd Auguste Reyers, 80
1030
BRUXELLES
Phone: +32 2 706 85 72
E-mail: thierry.deleeuw@ceb-bec.be
|
BEC Approval |
2012-10-30 |
Registration |
129260 |
ICS-Code (International Standards Classification) |
33.200
|
NBN Status |
New |
|
IEC publication date |
2012-10-30 |
IEC stability date |
2020-12-31 |
IEC last modification date |
2018-07-13 |
|