Publication details
Publication CODE |
Title |
NBN EN IEC 62239-1:2018 (2018-12) |
PROCESS MANAGEMENT FOR AVIONICS - MANAGEMENT PLAN - PART 1: PREPARATION AND MAINTENANCE OF AN ELECTRONIC COMPONENTS MANAGEMENT PLAN |
|
Price Excl. VAT |
Total number of pages, tables and drawings |
25.00 €
|
3. |
Description
IEC 62239-1:2018 defines the requirements for developing an electronic components management plan (ECMP) to guarantee to customers that all of the electronic components in the equipment of the plan owner are selected and applied in controlled processes compatible with the end application and that the technical requirements detailed in Clause 4 are accomplished. In general, the plan owner of a complete electronic components management plan (ECMP) is the avionics original equipment manufacturer (OEM).
This first edition cancels and replaces IEC TS 62239-1 published in 2015. This edition includes the following significant technical changes with respect to the previous edition:
a) added references to SAE EIA-STD-4899, IECQ OD 3702, IECQ OD 3407-1, IEC TR 62240-2, IECQ component schemes, SAE AS6081, SAE AS6171. GEIA-STD-0005-1 GEIA STD 0008;
b) replaced Annex C (which was transferred into IEC TR 62240-2) with a cross-reference table to SAE EIASTD4899 rev C clauses/ subclauses for guidance purposes only;
c) added the analysis of component technical erratum
d) updated Bibliography and reference documents
|
Class |
C
|
Available files
ATTENTION: Belgian registered standards (NBN EN or NBN HD) are generally
only available in English or French. Only the cover page is translated
and the document itself is in English or in French.
Very important notice: 98% of the text of the NBN EN 55XXX,
NBN EN 6XXXX comes from the IEC text which is NOT included.
This text can be ordered here:
IEC 62239-1:2018.
For the series NBN EN 50XXX, the standards are however complete.
|
DE version
|
EN version
|
FR version
|
|
Status
Status |
Registered trilingual Belgian standard EN or FR or DE |
Situation |
Currently active
|
|
Origin
Committee |
TC 107
PROCESS MANAGEMENT FOR AVIONICS
|
Approval
BEC Approval |
2018-10-29 |
NBN Approval |
2019-01-30 |
ICS-Code (International Standards Classification) |
03.100.50
, 31.020
, 49.060
|
NBN Status |
New |
|
Date of ratification (d.o.r.) |
2018-10-29 |
Date of availability (d.a.v.) |
2018-12-07 |
Date of announcement (d.o.a.) |
2019-01-29 |
Date of publication (d.o.p.) |
2019-07-29 |
Date of withdrawal former edition (d.o.w.) |
2021-10-29 |
|
Correspondences with international standards
Relation |
International standard |
Date |
is identical to |
EN IEC 62239-1:2018
|
2018-12-07 |
is identical to |
IEC 62239-1:2018
|
2018-09-24 |
Relations to belgian/foreign publications
Type |
Origin |
Code |
Date |
Standard |
Foreign |
IEC 62396-1:2016 |
|
Document |
Foreign |
IEC/TS 62647-1 |
|
|