Account:  - Login  |  Webstore  |  Shopping basket cart
English  |  Français  |  Nederlands

Publication details

Publication CODE Title
IEC 61850-4:2011+AMD1:2020 CSV (2020-11) COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 4: SYSTEM AND PROJECT MANAGEMENT
 
Price Excl. VAT Total number of pages, tables and drawings
466.00 € 47.
Description
IEC 61850-4:2011+A1:2020 applies to projects associated with process near automation systems of power utilities (UAS, utility automation system), like e.g. substation automation systems (SAS). It defines the system and project management for UAS systems with communication between intelligent electronic devices (IEDs) in the substation respective plant and the related system requirements. This second edition constitutes a technical revision to align the document more closely with the other parts of the IEC 61850 series, in addition to enlarging the scope from substation automation systems to all utility automation systems. This consolidated version consists of the second edition (2011) and its amendment 1 (2020). Therefore, no need to order amendment in addition to this publication.

This publication is of core relevance for Smart Grid.
Class  C990  (IEC PUBLICATIONS IEC PUBLICATIONS)
Available files
EN version

Status
Status IEC PUBLICATION
Situation Currently active
Origin
Committee TC 57
POWER SYSTEM CONTROL AND ASSOCIATED COMMUNICATIONS
Responsible Monsieur DE LEEUW Thierry, Technical Officer
Diamant Building Bd Auguste Reyers, 80
1030  BRUXELLES
Phone: +32 2 706 85 72
E-mail: thierry.deleeuw@ceb-bec.be
Approval
BEC Approval 2020-11-03
ICS-Code (International Standards Classification) 33.200
NBN Status New
IEC publication date 2020-11-03
IEC stability date 2020-12-31
IEC file modification date 2020-11-03
IEC last modification date 2020-11-03