NBN EN IEC 60193:2019 (2019-06) HYDRAULIC TURBINES, STORAGE PUMPS AND PUMP-TURBINES - MODEL ACCEPTANCE TESTS
 
Price Excl. VAT Total number of pages, tables and drawings
25.00 € 4.
Description
This document applies to laboratory models of any type of impulse or reaction hydraulic turbine, storage pump or pump-turbine. This document applies to models of prototype machines either with unit power greater than 5 MW or with reference diameter greater than 3 m. Full application of the procedures herein prescribed is not generally justified for machines with smaller power and size. Nevertheless, this document may be used for such machines by agreement between the purchaser and the supplier. In this document, the term "turbine" includes a pump-turbine operating as a turbine and the term "pump" includes a pump-turbine operating as a pump. This document excludes all matters of purely commercial interest, except those inextricably bound up with the conduct of the tests. This document is concerned with neither the structural details of the machines nor the mechanical properties of their components, so long as these do not affect model performance or the relationship between model and prototype performances. This document covers the arrangements for model acceptance tests to be performed on hydraulic turbines, storage pumps and pump-turbines to determine if the main hydraulic performance contract guarantees (see 4.2) have been satisfied. It contains the rules governing test conduct and prescribes measures to be taken if any phase of the tests is disputed. The main objectives of this document are: - to define the terms and quantities used; - to specify methods of testing and of measuring the quantities involved, in order to ascertain the hydraulic performance of the model; - to specify the methods of computation of results and of comparison with guarantees; - to determine if the contract guarantees that fall within the scope of this document have been fulfilled; - to define the extent, content and structure of the final report. The guarantees can be given in one of the following ways: - guarantees for prototype hydraulic performance, computed from model test results considering scale effects; - guarantees for model hydraulic performance. Moreover, additional performance data (see 4.4) can be needed for the design or the operation of the prototype of the hydraulic machine. Contrary to the requirements of Clauses 4 to 6 related to main hydraulic performance, the information of these additional data given in Clause 7 is considered only as recommendation or guidance to the user (see 7.1). It is particularly recommended that model acceptance tests be performed if the expected field conditions for acceptance tests (see IEC 60041:1991) would not allow the verification of guarantees given for the prototype machine. A transposition method taking into account the model and prototype wall surface roughness for the performance conversion on pump-turbines, Francis turbines, and axial machines is described in IEC 62097. This method requires model and prototype surface roughness data and is takes into account the shift in nED, QED and PED factors for determining the transposition of efficiency between model and prototype. However, in the case of Francis machines with semispiral casing and axial machines, the transposition method has not been fully validated due to a lack of data. In addition, IEC 62097 does not apply to storage pumps, Pelton turbines, and Dériaz. Therefore, for these and otherwise specifically agreed upon cases where hydraulically smooth flow conditions are assumed on the model and the prototype, the transposition formula and procedure given in Annex D and Annex I can be applied. Applications and limitations of both this document and IEC 62097 transposition methods are discussed in Annex E. The method for performance conversion from model to prototype needs to be clearly defined in the main hydraulic performance contract.
Class  C
Available files
ATTENTION: Belgian registered standards (NBN EN or NBN HD) are generally only available in English or French. Only the cover page is translated and the document itself is in English or in French.

Very important notice: 98% of the text of the NBN EN 55XXX, NBN EN 6XXXX comes from the IEC text which is NOT included. This text can be ordered here: IEC 60193:2019. For the series NBN EN 50XXX, the standards are however complete.

FR version
DE version
EN version
Status
Status Registered trilingual Belgian standard EN or FR or DE
Situation Currently active
Replaces  NBN EN 60193:2000
Origin
Committee TC 4
HYDRAULIC TURBINES
Responsible Ir DELENS Marc
Approval
BEC Approval 2019-05-30
NBN Approval 2019-07-24
ICS-Code (International Standards Classification) 27.140
NBN Status New
Date of ratification (d.o.r.) 2019-05-30
Date of availability (d.a.v.) 2019-06-14
Date of announcement (d.o.a.) 2019-08-30
Date of publication (d.o.p.) 2020-02-29
Date of withdrawal former edition (d.o.w.) 2022-05-30
Correspondences with international standards
Relation International standard Date
is identical to EN IEC 60193:2019 2019-06-14
is identical to IEC 60193:2019 2019-04-25
Relations to belgian/foreign publications
Type Origin Code Date
Standard Belgium EN 24185:1993
Standard Belgium EN ISO 4287:1998
Standard Belgium EN ISO 8316:1995
Standard Foreign ISO 2186:2007
Standard Foreign ISO 2533:1975
Standard Belgium NBN EN 62097:2009